Lease PlansA Photoplan Company

Lease Plans for New-Build Developments

Each new leasehold unit over seven years needs a compliant lease plan. Developments benefit from consistent drafting across the block from as-built or survey data.

8 min readUpdated 2026-09-22
Lease Plans for New-Build Developments

Do new-build developments need lease plans?

Yes.. Each new leasehold unit of more than seven years needs a Land Registry compliant lease plan defining its demise — typically the flat or house plus any parking, terrace or garden included in the lease. Developers and solicitors usually instruct plans from as-built or architectural drawings, with surveys where drawings are incomplete or plots have changed on site.

Why new builds need lease plans

Yes. Each new leasehold unit of more than seven years needs a Land Registry compliant lease plan defining its demise — typically the flat or house plus any parking, terrace or garden included in the lease. Developers and solicitors usually instruct plans from as-built or architectural drawings, with surveys where drawings are incomplete or plots have changed on site.

Multi-unit consistency

On a block of flats, every plan should use the same drafting conventions: floor labels, communal colouring, staircase logic and parking numbering. Inconsistent plans across a single development confuse examiners and buyers’ solicitors alike.

Multiple residential plans at one location are available at a reduced rate (£179 + VAT each with survey), which suits phased handovers and bulk instructions.

Parking, terraces and external areas

New-build leases often allocate numbered parking spaces, bin stores, cycle stores and private terraces. Each exclusive area must appear on the plan, clearly labelled and edged or tinted so it cannot be mistaken for communal land. Missing parking numbers are a frequent cause of late requisitions.

ElementUsually shown as
Flat / house interiorRed-edged demise
Private terrace or balconyWithin red edge or separately identified
Allocated parkingLabelled space, edged or tinted
Communal halls / stairsGreen where relevant
Bin / cycle storesLabelled; exclusive vs communal per lease

Typical new-build demise elements

Drawings, as-builts and site changes

Architect drawings are a strong starting point, but site changes during construction are common. Where possible, instruct from as-built information or arrange selective surveys for plots that deviate from the drawing set. Phased developments can be planned plot-by-plot as leases are granted.

Working with developer solicitors

Share the plot schedule, draft lease demise schedules and CAD or PDF drawings early. We return draft PDFs for approval against the plot list, then issue scaled prints for each registration pack. Fixed pricing and clear revision control keep bulk instructions predictable.

Need a lease plan?

We produce Land Registry compliant lease plans across England and Wales. Send us the property details for a fixed-price quote.

Related questions

Yes. Each new leasehold unit of more than seven years needs a Land Registry compliant lease plan defining its demise — typically the flat or house plus any parking, terrace or garden included in the lease. Developers and solicitors usually instruct plans from as-built or architectural drawings, with surveys where drawings are incomplete or plots have changed on site.

Get a free quote

Send us the property address and we will confirm a fixed price. Residential plans from £199 + VAT, commercial from £299 + VAT.

  • A Photoplan Company
  • Thousands of plans produced
  • Land Registry compliant
  • Nationwide coverage across England & Wales
  • Residential and commercial experience
Get a Free QuoteCall